Delivery scope concrete part
Secondary pit (NG) with high base part 155 cm The component is checked for leaks in the factory.
Delivery scope vortex floating bed with membrane filtration
• Growth body, sludge recirculation, submersible pump, float switch, system cable 25 m
• Overflow garnitur between preclarification and vortex floating bed chamber DN 150
• Concrete foot ventilation (air distribution) with Membrane aerators
• Filter housing with MicroClear®Filter, Permeat suction
• Plastic outside column, protection class IP 44 with computer control system incl. off-grid power failure monitoring, two air compressor, magnetic valves and visual / audible warning, small parts
|